Our company is successfully continuing the implementation of the next stage of energy savings. In the form of insulating the dormitory building it started in Mongolia in 2021. Thanks to the support from the Aid for Trade program, we managed to implement the boiler replacement project at the TVET Erdene school in 2022 too. One of the main goals was to make operations more efficient, reduce exhalation and air pollution, achieve economic savings and present quality products from the hands of Czech industrialists.
Our company was not alone in this success. The support of the Aid for Trade program, MPO, the Czech Embassy in Mongolia, the transport company and other and other persons, institutions and businesses both in the Czech Republic and Mongolia has resulted in a success that was achieved thanks to the efforts and commitment of all involved.
For the installed boiler with an output of 210 kW, the expected saving in coal consumption to date is more than 50 %. The delivery itself included service, operating instructions, operator training and professional installation by a Czech chief fitter, who ensured trouble-free operation of the equipment and testing directly at the site of implementation.
ЧЕХҮҮД ЭРДЭНЭ СУМЫН СУРГУУЛЬД ШИНЭ УУРЫН ЗУУХ БЭЛЭГЛЭЛЭЭ
3 дахин бага нүүрс зарцуулах ба 2 дахин их хүчин чадалтай. Шинэ халаалтын зуух Танд таалагдаж байна уу? Өмнөх болон дараах зургийг хавсаргав.@ed_mzvcr 🇨🇿❤️🇲🇳 @MongolDiplomacy Contact: @BorivojMinar Contechin pic.twitter.com/qZu463wpEj— Jan Vytopil 🇨🇿 (@JanVytopil) November 14, 2022